TSLA376.37+0.0%
SPCX185.00+0.0%
Tape1

Market-cap sensitivity, not a price target

Objective pricing

Every trench has three numbers plus $ per remaining point.

Objective%RelevanceTo dateTo finishHitMiss$/pt
TeslaDONE

Sports-car beachhead (Roadster 1)

100%5$40M–$90M$1.50T$0$0
SpaceXDONE

Falcon 1 orbital (prove we can reach orbit)

100%5$100M–$300M$1.80T$0$0
TeslaDONE

Higher-volume sedan / SUV (S then X)

100%8$2.0B–$5.0B$80.0B−$50.0B$0
SpaceXDONE

Falcon 9 operational + first-stage reuse

98%25$1.0B–$3.0B$0–$200M$400.0B$0$50M
SpaceXDONE

Landing zone / ASDS drone-ship reuse architecture

100%8$300M–$800M$80.0B$0$0
MergeIN TRENCHES

Energy beachhead (Powerwall / Megapack / SolarCity)

52%55$8.0B–$15.0B$5.0B–$12.0B$200.0B−$40.0B$177M
TeslaDONE

Mass-market volume cars (3 / Y)

95%20$15.0B–$30.0B$0–$2.0B$400.0B−$200.0B$200M
SpaceXDONE

Falcon Heavy

100%10$500M–$1.5B$40.0B−$15.0B$0
SpaceXDONE

Cargo Dragon / Crew Dragon

95%20$2.0B–$4.0B$0–$300M$50.0B−$20.0B$30M
SpaceXDONE

NASA Commercial Crew + cargo + HLS award

100%45$3.0B–$6.0B$40.0B−$25.0B$0
TeslaCONTEXT / NOT OWNED

Master Plan III world-scale items Tesla does not operate

0%0$0–$50M$0$0$0
TeslaIN TRENCHES

Supercharger / NACS as a network

72%8$4.0B–$8.0B$2.0B–$6.0B$50.0B−$15.0B$143M
TeslaIN TRENCHES

Segment expansion: Cybertruck (Semi unbundled)

55%15$3.0B–$6.0B$1.0B–$3.0B$40.0B−$15.0B$44M
MergeIN TRENCHES

FSD as a paid supervised product

70%70$15.0B–$30.0B$8.0B–$20.0B$600.0B−$400.0B$467M
SpaceXIN TRENCHES

ISS United States Deorbit Vehicle

25%10$100M–$400M$500M–$1.2B$2.0B−$2.0B$11M
SpaceXIN TRENCHES

Polaris / commercial crew beyond NASA

45%12$200M–$1.0B$1.0B–$6.0B$20.0B−$2.0B$64M
TeslaSLIPPED

Next-gen affordable / compact LFP platform

28%18$1.0B–$4.0B$4.0B–$12.0B$150.0B−$40.0B$111M
TeslaCONTEXT / NOT OWNED

Master Plan IV abundance / AI / robots wrapper

0%40$0$0$0
TeslaIN TRENCHES

Closed-loop battery recycling (Nevada)

32%18$300M–$1.2B$1.0B–$4.0B$25.0B−$6.0B$37M
MergeIN TRENCHES

Tesla energy for Starbase / compute

35%78$200M–$1.5B$1.0B–$5.0B$25.0B−$5.0B$46M
SpaceXIN TRENCHES

SLC-37 Starship pad (third orbital site)

14%22$50M–$400M$1.0B–$4.0B$40.0B−$10.0B$29M
TeslaSLIPPED

Unboxed process / Giga Mexico

15%25$500M–$2.5B$4.0B–$12.0B$80.0B−$20.0B$94M
MergeIN TRENCHES

Cybercab scale (unboxed, ~$30k, ~$0.30/mi)

18%80$3.0B–$8.0B$8.0B–$20.0B$400.0B−$80.0B$171M
SpaceXIN TRENCHES

Commercial LEO destination (Starlab / Haven class)

16%15$100M–$800M$8.0B–$30.0B$40.0B−$5.0B$226M
TeslaIN TRENCHES

Tesla Semi (Class-8 freight, unbundled)

42%12$3.0B–$5.0B$2.0B–$6.0B$40.0B−$12.0B$69M
SpaceXIN TRENCHES

Raptor 3 production factory

40%55$1.0B–$4.0B$2.0B–$8.0B$150.0B−$80.0B$83M
SpaceXIN TRENCHES

Full-scale orbital cryogenic propellant transfer

18%70$500M–$2.0B$2.0B–$8.0B$200.0B−$150.0B$61M
SpaceXDONE

SpaceX IPO (capital-markets trench)

100%90$0–$500M$85.0B−$30.0B$0
MergeIN TRENCHES

Tesla 2025/2028 pay package (process)

40%74$50M–$200M$20M–$100M$50.0B−$80.0B$1M
MergeIN TRENCHES

Starshield (NRO proliferated LEO)

58%94$2.0B–$8.0B$8.0B–$25.0B$200.0B−$80.0B$393M
SpaceXIN TRENCHES

Starlink enterprise / backhaul / cellular

52%26$500M–$2.0B$1.0B–$5.0B$70.0B−$12.0B$63M
MergeIN TRENCHES

Starlink optical ISL mesh

64%34$1.0B–$4.0B$2.0B–$8.0B$60.0B−$10.0B$139M
MergeIN TRENCHES

Starlink Government (civil / DoD unclassified)

60%58$300M–$1.5B$500M–$3.0B$50.0B−$10.0B$44M
TeslaIN TRENCHES

Vertical materials (4680, LFP, Li refinery, cathode)

38%40$6.0B–$12.0B$8.0B–$18.0B$120.0B−$30.0B$210M
MergeIN TRENCHES

Dojo / Cortex / AI5–AI6 / in-house inference

40%85$8.0B–$20.0B$15.0B–$40.0B$250.0B−$80.0B$458M
MergeIN TRENCHES

Virtual power plant / Autobidder

45%50$400M–$1.5B$1.0B–$4.0B$60.0B−$8.0B$45M
TeslaIN TRENCHES

Tesla Insurance (safety-score P&L)

34%18$400M–$1.5B$1.0B–$4.0B$40.0B−$8.0B$38M
TeslaSLIPPED

Solar Roof / rooftop solar

22%8$1.0B–$3.0B$2.0B–$8.0B$25.0B−$5.0B$64M
TeslaIN TRENCHES

Giga Berlin as a volume plant

68%14$5.0B–$8.0B$1.0B–$4.0B$50.0B−$15.0B$78M
TeslaIN TRENCHES

Texas lithium refinery (unbundled)

28%16$30.0B−$8.0B$0
TeslaIN TRENCHES

4680 cell line (unbundled)

48%24$60.0B−$15.0B$0
SpaceXIN TRENCHES

Starlink Aviation + Maritime

55%20$1.0B–$4.0B$2.0B–$8.0B$80.0B−$15.0B$111M
TeslaDONE

1 million through 10 millionth vehicle

100%25$25.0B–$45.0B$250.0B$0$0
MergeIN TRENCHES

Terafab site / state incentives

12%70$0–$80M$20.0B−$10.0B$0
MergeIN TRENCHES

Terafab process node

6%82$0–$200M$80.0B−$40.0B$0
MergeIN TRENCHES

Terafab advanced packaging

9%84$0–$150M$90.0B−$30.0B$0
MergeIN TRENCHES

Terafab talent / yield org

5%80$0–$50M$40.0B−$20.0B$0
MergeIN TRENCHES

Terafab CHIPS / CFIUS / export

8%90$0–$30M$25.0B−$55.0B$0
MergeIN TRENCHES

Terafab tools / EUV queue

3%85$50.0B−$20.0B$0
MergeIN TRENCHES

Terafab (shared chip moonshot)

8%98$200M–$2.0B$40.0B–$70.0B$300.0B−$80.0B$598M
MergeIN TRENCHES

Terafab transfer-pricing collar

2%94$0–$20M$100.0B−$80.0B$0
MergeIN TRENCHES

Tesla Texas venue + independent committee

15%96$20M–$80M$50M–$400M$100.0B−$200.0B$3M
TeslaIN TRENCHES

FSD licensed to other OEMs

7%22$0–$200M$1.0B–$8.0B$80.0B$0$48M
TeslaIN TRENCHES

Unsupervised FSD on highways

18%28$2.0B–$10.0B$120.0B−$20.0B$73M
MergeBLOCKED

FSD China / EU type approval

16%71$200M–$1.0B$1.0B–$6.0B$80.0B−$40.0B$42M
MergeIN TRENCHES

Terafab captive offtake split

4%93$60.0B−$40.0B$0
MergeIN TRENCHES

Grok as the driving model

6%90$0–$300M$3.0B–$20.0B$200.0B−$15.0B$122M
MergeIN TRENCHES

Tesla-sold Starlink hardware

14%64$0–$50M$100M–$800M$8.0B$0$5M
MergeIN TRENCHES

Tesla–SpaceX talent secondment

30%83$0–$200M$15.0B−$10.0B$1M
MergeIN TRENCHES

Starlink in Cybercab / robotaxi

22%86$50M–$400M$500M–$3.0B$40.0B−$8.0B$22M
MergeIN TRENCHES

Digital Optimus (Macrohard)

12%91$100M–$800M$2.0B–$12.0B$80.0B−$10.0B$80M
MergeIN TRENCHES

Grok in Tesla vehicles

38%89$50M–$400M$500M–$3.0B$40.0B−$8.0B$28M
MergeIN TRENCHES

Tesla’s SpaceX holding (mark-to-market)

55%88$30.0B−$50.0B$0
SpaceXDONE

Starship integrated flight-test program exists

100%70$5.0B–$10.0B$100.0B−$80.0B$0
SpaceXIN TRENCHES

Starship tanker / depot vehicle

10%42$0–$400M$4.0B–$15.0B$120.0B−$80.0B$106M
MergeIN TRENCHES

Megapack 3 / Megafactory / grid services

52%60$4.0B–$8.0B$4.0B–$10.0B$180.0B−$20.0B$146M
MergeSLIPPED

Roadster 2 (and the A71 SpaceX package)

8%55$200M–$1.0B$1.0B–$4.0B$15.0B−$3.0B$27M
MergeIN TRENCHES

Powerwall 3 attach / residential storage

58%32$2.0B–$5.0B$1.0B–$4.0B$40.0B−$8.0B$60M
MergeIN TRENCHES

Optimus (general-purpose labor product)

14%92$2.0B–$6.0B$20.0B–$80.0B$1.00T−$120.0B$581M
MergeIN TRENCHES

Starlink as a real ISP

78%75$10.0B–$20.0B$8.0B–$25.0B$500.0B−$200.0B$750M
SpaceXSLIPPED

Starship ship catch (chopsticks)

18%48$150.0B−$60.0B$0
MergeIN TRENCHES

NSSL Phase 3 (sole active flyer)

72%78$2.0B–$8.0B$80.0B−$40.0B$179M
SpaceXIN TRENCHES

Starship / Super Heavy factory rate

36%50$2.0B–$8.0B$4.0B–$15.0B$200.0B−$70.0B$148M
SpaceXIN TRENCHES

Starship heat-shield life

28%44$500M–$2.0B$1.0B–$5.0B$180.0B−$90.0B$42M
MergeIN TRENCHES

Starshield PNT / GPS alternative

20%76$40.0B$0$0
MergeIN TRENCHES

Orbital compute / space data centers

4%82$0–$500M$500.0B$0$0
SpaceXIN TRENCHES

Starship Florida pad (LC-39A / second orbital site)

48%40$800M–$2.5B$500M–$2.0B$80.0B−$25.0B$24M
MergeIN TRENCHES

Tesla Megapacks at Colossus

35%81$200M–$2.0B$1.0B–$6.0B$40.0B−$15.0B$54M
MergeIN TRENCHES

Colossus / Memphis ground compute

62%80$20.0B–$45.0B$15.0B–$40.0B$400.0B−$150.0B$724M
MergeSLIPPED

Unsupervised Robotaxi / Tesla Network

24%88$20.0B–$40.0B$25.0B–$80.0B$800.0B−$350.0B$691M
MergeIN TRENCHES

SpaceX AI cloud / hosting ARR

50%72$0–$5.0B$350.0B−$200.0B$50M
MergeIN TRENCHES

Direct-to-cell Starlink (T-Satellite → Starlink Mobile)

42%45$4.0B–$20.0B$8.0B–$40.0B$200.0B−$30.0B$414M
SpaceXIN TRENCHES

Starship to operational orbit + payload deploy + rapid reuse

40%95$8.0B–$15.0B$8.0B–$20.0B$600.0B−$250.0B$233M
SpaceXIN TRENCHES

Starlink V3 mass deploy via Starship

18%72$2.0B–$6.0B$10.0B–$30.0B$350.0B−$100.0B$244M
SpaceXIN TRENCHES

Super Heavy + Ship cadence for a Mars window

7%55$2.0B–$6.0B$15.0B–$40.0B$300.0B−$80.0B$296M
MergeSLIPPED

Uncrewed Mars 2026 window (and the slip track)

8%80$500M–$2.0B$20.0B–$80.0B$200.0B−$60.0B$543M
MergeIN TRENCHES

Optimus as Mars / Moon labor

6%90$0–$200M$5.0B–$30.0B$150.0B−$20.0B$186M
SpaceXIN TRENCHES

Starship as $10s–$100s/kg launch

20%65$400.0B−$150.0B$0
SpaceXSLIPPED

Starship HLS / Artemis path

24%50$4.0B–$8.0B$8.0B–$20.0B$120.0B−$80.0B$184M
SpaceXCONTEXT / NOT OWNED

Earth-to-Earth Starship

3%30$0–$100M$20.0B–$100.0B$100.0B$0$619M
MergeCONTEXT / NOT OWNED

Mars ECLSS / surface life support

4%40$0–$200M$100.0B$0$0
SpaceXCONTEXT / NOT OWNED

Multiplanetary city

0%30$100.0B–$1.00T$0$0$5.5B