TSLA376.37+0.0%
SPCX185.00+0.0%
Tape

Market-cap sensitivity, not a price target

Objective pricing

Every trench has three numbers plus $ per remaining point.

Objective%RelevanceTo dateTo finishHitMiss$/pt
TeslaDONE

Sports-car beachhead (Roadster 1)

100%5$40M–$90M—$1.50T$0$0
SpaceXDONE

Falcon 1 orbital (prove we can reach orbit)

100%5$100M–$300M—$1.80T$0$0
TeslaDONE

Higher-volume sedan / SUV (S then X)

100%8$2.0B–$5.0B—$80.0B−$50.0B$0
SpaceXDONE

Falcon 9 operational + first-stage reuse

98%25$1.0B–$3.0B$0–$200M$400.0B$0$50M
SpaceXDONE

Landing zone / ASDS drone-ship reuse architecture

100%8$300M–$800M—$80.0B$0$0
MergeIN TRENCHES

Energy beachhead (Powerwall / Megapack / SolarCity)

52%55$8.0B–$15.0B$5.0B–$12.0B$200.0B−$40.0B$177M
TeslaDONE

Mass-market volume cars (3 / Y)

95%20$15.0B–$30.0B$0–$2.0B$400.0B−$200.0B$200M
SpaceXDONE

Falcon Heavy

100%10$500M–$1.5B—$40.0B−$15.0B$0
SpaceXDONE

Cargo Dragon / Crew Dragon

95%20$2.0B–$4.0B$0–$300M$50.0B−$20.0B$30M
SpaceXDONE

NASA Commercial Crew + cargo + HLS award

100%45$3.0B–$6.0B—$40.0B−$25.0B$0
TeslaCONTEXT / NOT OWNED

Master Plan III world-scale items Tesla does not operate

0%0$0–$50M—$0$0$0
TeslaIN TRENCHES

Segment expansion: Cybertruck + Semi

48%15$4.0B–$8.0B$2.0B–$6.0B$80.0B−$25.0B$77M
MergeIN TRENCHES

FSD as a paid supervised product

70%70$15.0B–$30.0B$8.0B–$20.0B$600.0B−$400.0B$467M
TeslaSLIPPED

Next-gen affordable / compact LFP platform

28%18$1.0B–$4.0B$4.0B–$12.0B$150.0B−$40.0B$111M
TeslaCONTEXT / NOT OWNED

Master Plan IV abundance / AI / robots wrapper

0%40——$0$0$0
MergeIN TRENCHES

Tesla energy for Starbase / compute

35%78$200M–$1.5B$1.0B–$5.0B$25.0B−$5.0B$46M
MergeIN TRENCHES

Cybercab scale (unboxed, ~$30k, ~$0.30/mi)

18%80$3.0B–$8.0B$8.0B–$20.0B$400.0B−$80.0B$171M
SpaceXIN TRENCHES

Full-scale orbital cryogenic propellant transfer

18%70$500M–$2.0B$2.0B–$8.0B$200.0B−$150.0B$61M
SpaceXDONE

SpaceX IPO (capital-markets trench)

100%90$0–$500M—$85.0B−$30.0B$0
MergeIN TRENCHES

Starshield (NRO proliferated LEO)

58%94$2.0B–$8.0B$8.0B–$25.0B$200.0B−$80.0B$393M
TeslaIN TRENCHES

Vertical materials (4680, LFP, Li refinery, cathode)

38%40$6.0B–$12.0B$8.0B–$18.0B$120.0B−$30.0B$210M
MergeIN TRENCHES

Dojo / Cortex / AI5–AI6 / in-house inference

40%85$8.0B–$20.0B$15.0B–$40.0B$250.0B−$80.0B$458M
TeslaDONE

1 million through 10 millionth vehicle

100%25$25.0B–$45.0B—$250.0B$0$0
MergeIN TRENCHES

Terafab (shared chip moonshot)

8%98$200M–$2.0B$40.0B–$70.0B$300.0B−$80.0B$598M
MergeIN TRENCHES

Starlink in Cybercab / robotaxi

22%86$50M–$400M$500M–$3.0B$40.0B−$8.0B$22M
SpaceXDONE

Starship integrated flight-test program exists

100%70$5.0B–$10.0B—$100.0B−$80.0B$0
MergeIN TRENCHES

Megapack 3 / Megafactory / grid services

52%60$4.0B–$8.0B$4.0B–$10.0B$180.0B−$20.0B$146M
MergeIN TRENCHES

Optimus (general-purpose labor product)

14%92$2.0B–$6.0B$20.0B–$80.0B$1.00T−$120.0B$581M
MergeIN TRENCHES

Starlink as a real ISP

78%75$10.0B–$20.0B$8.0B–$25.0B$500.0B−$200.0B$750M
MergeSLIPPED

Unsupervised Robotaxi / Tesla Network

24%88$20.0B–$40.0B$25.0B–$80.0B$800.0B−$350.0B$691M
SpaceXIN TRENCHES

Starship to operational orbit + payload deploy + rapid reuse

48%95$8.0B–$15.0B$8.0B–$20.0B$600.0B−$250.0B$269M
SpaceXIN TRENCHES

Starlink V3 mass deploy via Starship

28%72$2.0B–$6.0B$10.0B–$30.0B$350.0B−$100.0B$278M
SpaceXIN TRENCHES

Super Heavy + Ship cadence for a Mars window

7%55$2.0B–$6.0B$15.0B–$40.0B$300.0B−$80.0B$296M
MergeSLIPPED

Uncrewed Mars 2026 window (and the slip track)

8%80$500M–$2.0B$20.0B–$80.0B$200.0B−$60.0B$543M
MergeIN TRENCHES

Optimus as Mars / Moon labor

6%90$0–$200M$5.0B–$30.0B$150.0B−$20.0B$186M
SpaceXIN TRENCHES

Starship as $10s–$100s/kg launch

20%65——$400.0B−$150.0B$0
SpaceXSLIPPED

Starship HLS / Artemis path

24%50$4.0B–$8.0B$8.0B–$20.0B$120.0B−$80.0B$184M
SpaceXCONTEXT / NOT OWNED

Multiplanetary city

0%30—$100.0B–$1.00T$0$0$5.5B