TSLA376.37+0.0%
SPCX185.00+0.0%
Tape1

Board fight kit

One-pager for a board fight

CSV of every trench for the spreadsheet. Print this page for a PDF brief. Percentages are estimates from public artifacts. A one-pager is not a fairness opinion.

Sample JSON (12 nodes)
Reconstruction — empty boardroom, unmarked folders. Not a Tesla or SpaceX meeting. No people.
Reconstruction — empty boardroom, unmarked folders. Not a Tesla or SpaceX meeting. No people.
Reconstruction — empty committee table. The valuation collar has not shipped. Twelve chairs, one closed docket.
Reconstruction — empty committee table. The valuation collar has not shipped. Twelve chairs, one closed docket.

Base-case window

2028+ (delayed)

Valuation

20

Gauges move with the live tickers when the feed is up. Seed snapshot is labeled stale.

Capital followed the print

T 78 · S 88

2026 Q3

What to take into the room

  • Cash vs furnace

    Tesla is the cash cow. SpaceX is the capex furnace.

    Tesla: public, cash-flow positive, ~$1.4–1.5T-class in mid-2026 merger coverage, ~$43–45B cash pile in contemporaneous reports. SpaceX: public June 2026 at ~$1.8T-class print (first week ~$2.44T). Still burning on AI/Starship. Q2 2026 net loss narrowed to $541M on $7.8B revenue. Combining them “might make Elon’s life a little easier.” That is the honest executive reason.

  • Collar

    Tesla holders may only accept 50–66% of combined equity.

    Morningstar-style work. Current ~1.4T / (1.4+2.2) ≈ 39% would be unfair to Tesla holders if SpaceX stays bid-up as a meme-AI wrapper over a launch co that is not yet Starship-operational. An independent Tesla committee has not published a valuation collar a court can defend.

  • Both sides

    Elon sits on both sides of the table.

    ~13–20% Tesla economic / ~20% votes (options-dependent). SpaceX voting control described ~84% post-IPO. That is the central agency problem, not a personality story. A pay package is not a merger agreement.

  • Silent killer

    China is the file that can kill the combination.

    Tesla China is the cash printer. Starshield is NRO-operated, government-owned. They do not share a regulator. Beijing + CFIUS is a gate, not a vibe. The scenario lab’s China toggle is the honest model input.

  • Clock

    Base-case window: late 2027 – mid 2028.

    Earlier if Flight 14+ deploys V3 to orbit, robotaxi miles look like a business, and an independent Tesla committee publishes a collar. Later if China blocks, a robotaxi fatality freezes NHTSA, Starship fails the orbital-reuse loop, or SpaceX stays bid-up.

Four gauges, this snapshot

2028+ (delayed)

Delay case. China unsolved, or Starship has not closed orbital-reuse, or SpaceX is still bid-up enough that Tesla holders revolt.

76/100

Engineering

20/100

Valuation

30/100

Regulatory

38/100

Cash-flow

Wedbush (Ives) unofficial odds 80–90% over a few years — market gossip, not physics. Polymarket Sep 2026: ~46.5% announced by end-2027, ~3.8% by 30 Sep 2026.

Do not confuse

These substitutions are how a board fight gets lost. Each is a labeled reconstruction of a common mix-up, not a prediction.

  • Supervised FSD with autonomy
  • An HLS award with a landing
  • An IPO print with a DCF
  • A 2026 Mars slide with a city
  • A factory photo with nameplate
  • A LOI with a fab
  • Academy bots with useful labor
  • Energy GWh with Solar Roof

Slipping / blocked trenches

Daily wire

  • Sep 2026 · spacex

    Starship Flight 14 orbital attempt

    NET 15 Sep. First true orbital + ~20 V3. Ship catch delayed.

  • Sep 24 2026 · tesla

    Semi factory inauguration (Sparks)

    Ceremonial open. High-volume line already running since April. Nameplate is 50k/yr.

  • 2H 2026 · tesla

    Cybercab ramp

    Line started Feb 2026. Ramp described as late-2026 into 2027.

  • 2H 2026 · tesla

    Optimus internal Academy units

    Fremont S/X converted ~late Aug. Not customer sales.

  • Dec 2026 · spacex

    AI hosting ~$1.11B/mo starts

    CFO: third CSA from Dec 1. 90-day outs. Not FY $100B.

  • Aug 2026+ · tesla

    Megapack 3 production

    ~5 MWh pack entered production August.

Back to merge clock